Craigie Refurbishment

In June 2021, Joondalup Council approved the building tender for the $8.7 million Craigie Leisure Centre refurbishment project. Construction for stage one of the refurbishment has now commenced.

Floor Plan - Craigie Leisure Centre Refurbishment

Floor Plan - Stage 1 - Craigie Leisure Centre Refurbishment

Floor Plan - Stage 2 - Craigie Leisure Centre Refurbishment

STAGE 1
AUGUST 2021 – APRIL 2022
Creche

Relocation and extension of the creche, with indoor and outdoor play areas.

Group Fitness Studio

Relocation and extension of the group fitness studio (from approximately 340m2 to 400m2), with improved audio-visual features.

Indoor Cycle Studio

Relocation and extension of the cycle studio (from approximately 25m2 to 75m2), with improved audio-visual features.

Carpark

Formalisation of the existing western overflow car park area and new additional car parking on the northern ring road..

STAGE 2
APRIL 2022 – FEBRUARY 2023
Gym

Extension of the gym from 500m2 to 1,200m2. New and expanded gym changerooms and toilet area.

Changerooms

New and expanded gym changerooms and toilet area.

Wellness Studio

Relocation and extension of the wellness studio (from approximately 210m2 to 225m2), with improved audio-visual features.

Carpark

Main entry access road upgrades, pedestrian crossing upgrades and the addition of kiss and drive car bays.

FAQS
What works were completed in Stage 1?

The following works were completed during Stage 1 construction:

  • Construction of the new and expanded creche.
  • Construction of the new and expanded group fitness studio.
  • Construction of the new and expanded indoor cycling studio.
  • Relocation of the staff room.
  • Formalisation of the existing western overflow carpark area and new additional car parking on the northern ring road.

The new creche, group fitness studio and indoor cycle studio will open on Saturday 9 April 2022.

What works are being completed in Stage 2?

The following works are being completed during Stage 2 construction:

  • Extension of the gym.
  • Construction of the new and expanded gym changeroom and toilet area.
  • Construction of the new and expanded wellness studio.
  • Main entry access road upgrades, pedestrian crossing upgrades and addition of kiss and drive car bays.
When will Stage 2 construction commence?

Construction for Stage 2 will commence on Thursday 14 April 2022 and is estimated to be completed in February 2023.

What happens to the existing gym during Stage 2 construction?

During Stage 2 construction, the existing gym will be relocated to Court 4.

Why is the gym closing on Wednesday 13 April 2022?

The gym will be closed on Wednesday 13 April 2022 to allow us to relocate all of the equipment onto Court 4 and complete the set up of your new gym space.

The gym will be reopened on Court 4 from Thursday 14 April 2022.

What gym equipment will be available on Court 4?

We have worked hard to replicate the current gym environment for our members, and we hope you’ll love the extra space this area will provide. 

  • Floor space will increase from 500sqm to approximately 650sqm
  • All equipment from the existing gym will be relocated
  • Omnia classes will be available on Court 4
  • Platinum Gym Circuit will remain on Court 4 as part of the new gym space
  • Temporary rubber gym flooring is being installed onto Court 4
  • Air cooling was installed in November 2021 and will remain fully operational
  • A larger stretch area and a dedicated health consultation space is being created
  • TVs, audio system and WIFI will be available
Will Omnia be available on Court 4?

Yes. All Omnia classes, including Platinum Omnia, will be relocated to Court 4.

What happens to the Platinum Circuit, currently set up on Court 4?

Platinum Circuit will be unavailable from Saturday 9 April 2022 – Wednesday 13 April 2022. Platinum Circuit will resume on Court 4 from Thursday 14 April 2022, with a dedicated workout area sectioned off for Platinum Circuit class times.

How do I access the gym on Court 4?

Your gym access will remain the same. A gym customer service desk will be set up on Court 4 to enable you to scan in with your membership card and access the gym.

What improvements are being made to the new gym during Stage 2?

The gym will more than double in size, from approximately 500 m2 to 1,200 m2. The new gym will include,

  • Cardio area
  • Omnia equipment for small group classes
  • Larger stretching space
  • Cardio area
  • Free weights area
  • Running track
  • Health consult rooms

The layout of the equipment in the gym will be confirmed and communicated to members closer to the reopening in February 2023.

What improvements are being made to the gym changerooms?

The gym changerooms will include,

  • Six toilets and six showers.
  • Changeroom area.
  • Lockers.
  • Ironing station.
  • Hairdryers and straightening irons.

The gym will be extended into the current group fitness studio space.

What improvements are being made to the carpark?

Stage 2 works will involve:

  • Main entry access road upgrades, pedestrian crossing upgrades and the addition of kiss and drive car bays.
Will there be any changes to my membership?

The centre will maintain full operations during stage 1 and stage 2 of construction, with temporary changes to health and fitness facilities currently being finalised. Craigie Leisure Centre will endeavour to minimise impact on all members and user groups during construction and project updates will be communicated as the project commences.

As all facilities will remain available, your membership will continue as normal. If you have any questions, please email or call 9400 4600.

Will facility hirers be affected throughout construction?

Due to relocation of programs and services, some facility hirers may be impacted during construction. If your group is impacted, we have been in contact with you directly, to discuss alternative options. Craigie Leisure Centre will aim to minimise impact on all customers as much as possible.

Will my Short Course be affected?

Due to the relocation of programs and services, some short courses may be relocated to alternative rooms or spaces in the facility. If your course is impacted, we will be in contact with your directly, to let you know the new and temporary arrangements. Craigie Leisure Centre will aim to minimise impact on all customers as much as possible.

How can I stay up to date?
Stay up to date by following Craigie Leisure Centre on Facebook or Instagram, or subscribe to Leisure Online.

 

For more information, please call 9400 4600.

 

We'd love to hear from you

Complete the form below with details of your enquiry and we'll get back to you within seven days.

Please let us know your name.
Please include a valid email address.
Invalid Input
Please Choose an Enquiry Type
Please include a question or a query.
Please provide a url.

Craigie Leisure Centre

Whitfords Avenue
Craigie WA 6025
9400 4600

Website Feedback

Website Feedback

Having trouble with the site or want to leave us some feedback? Fill out the form and let us know so we can do our best to improve.

Please let us know your name.
Please include a valid email address.
Please include some feedback.
Please try the captcha again.